Crane power line clearance calculator

Enter the line voltage and what the crane is doing, and get the minimum distance OSHA sets, the rule behind it, and whether a planned closest approach meets it. A line of unknown voltage gets no distance, on purpose.

Minimum clearance from a power line

Table A distance (option 3), rule: 1926.1408 Table A (option 3)
15 ft, Meets it
Default distance (option 2), rule: 1926.1408(a)(2), option 2
20 ft, Too close

Option 2 or option 3 applies only if some part of the equipment, load line or load could get closer than 20 feet (50 feet over 350 kV) when worked to its full radius in the work zone. Either option also needs the planning meeting, a warning line and at least one control measure from 1926.1408(b). Deenergizing and grounding the line is option 1.

Use the nominal voltage in kV that the utility owner or operator gave you. The starting values are invented for teaching.

Studying for NCCCO written? Take the free 10-question check to see exactly which topics to fix first, then close the gaps with the Boom Angle course.

How the clearance rules fit together

OSHA's crane rule, Subpart CC, sets the distance in two places, depending on what the equipment is doing. Each time, the voltage picks the band and the band gives the distance in feet.

  • Working near a line, 1926.1408. If any part of the equipment, load line or load could get closer than 20 feet to a line when worked to its full radius in the work zone, the employer picks one of three options: deenergize and visibly ground the line, keep 20 feet away, or keep the Table A distance for that voltage.
  • Over 350 kV, 1926.1409. The same rules apply with 50 feet in place of 20 feet, for lines up to 1,000 kV.
  • Over 1,000 kV. No table figure exists. The utility owner or operator, or a registered professional engineer qualified in power transmission and distribution, sets the distance.
  • Traveling with no load, 1926.1411. Table T gives the distance while the equipment moves with the boom or mast lowered, and it allows for speed and terrain. Moving with a load is governed by 1926.1408 and the sections next to it, not by Table T.

The 20 foot option is the simple one, but it can be larger than needed on a low-voltage line. Table A is tighter and needs the voltage. Both options still need the planning meeting, a warning line or barricade, and at least one control such as a proximity alarm or a dedicated spotter. Paragraph 1926.1408(d) bars working below a line unless it is deenergized and grounded or an exception applies.

The two tables, as read on 25 Oct 2026

Each voltage is nominal, AC, in kV. A band such as “over 50 to 200” includes 200 kV. We read the values from the eCFR on 25 Oct 2026, which showed the rule current through the 22 Oct 2026 issue. Check the linked rule before you rely on them, because the rule can be amended.

Table A, minimum clearance when working near a line (1926.1408)
Voltage (kV)Distance (ft)
up to 5010
over 50 to 20015
over 200 to 35020
over 350 to 50025
over 500 to 75035
over 750 to 1,00045
over 1,000set by the utility owner or a registered engineer
Table T, minimum clearance when traveling with no load (1926.1411)
Voltage (kV)Distance (ft)
up to 0.754
over 0.75 to 506
over 50 to 34510
over 345 to 75016
over 750 to 1,00020
over 1,000set by the utility owner or a registered engineer

Notice that the bands are not the same. Table A breaks at 350 kV and Table T at 345 kV, and Table T has bands for very low voltage that Table A does not.

Worked example 1: a 115 kV line, working near it

115 kV falls in the “over 50 to 200” band, so Table A gives 15 ft. The 20 foot option gives 20 ft. A planned closest approach of 18 ft meets the Table A distance and is too close for the 20 foot option. So with the voltage confirmed and option 3 chosen, 18 ft is allowed with the measures in 1926.1408(b). Under option 2 it is not.

Worked example 2: a 500 kV line, then travel

500 kV is the top of the “over 350 to 500” band, so Table A gives 25 ft, and the default distance is 50 ft because the line is over 350 kV. Planning 30 ft meets Table A and falls short of the 50 foot default. For the same line, a crane traveling with no load falls in Table T's “over 345 to 750” band, so the travel distance is 16 ft. The voltage and distances are invented for teaching. These are original examples, not exam questions.

How this shows up in Core study

Power lines appear in tasks 1.3, 2.5 and 2.15 of the NCCCO Core outline. Know the order of thought: assume the line is energized, find the voltage from the owner, then decide whether any part of the crane, line or load can reach inside the distance. The power line safety explainer covers the mindset, and the Core study guide maps the tasks to the OSHA sections. You do not need to memorize every band for a written exam to understand why they exist.

Crane power line clearance questions

What is the difference between the 20 foot option and Table A?

Both are ways to meet 1926.1408 when equipment could get close to a line. The 20 foot option keeps every part of the equipment, load line and load at least 20 feet away, whatever the voltage up to 350 kV. Table A lets you work closer on a lower-voltage line, down to 10 feet at 50 kV or less, once you know the voltage. Above 350 kV the 20 foot default becomes 50 feet.

What if I do not know the voltage?

Treat the line as energized and get the voltage from the utility owner or operator. This calculator gives no distance for an unknown voltage, because a figure for the wrong band could be too small. The 20 foot option covers lines up to 350 kV, so it also cannot be used until you know the line is in that range.

Does a distance that exactly equals the minimum pass?

The rule is written as not getting closer than the distance, so equal to the minimum meets it. The calculator marks that as meeting it. Real plans add margin for swing, sway and sag, which this page does not model.

Pick the voltage band and read its distance from OSHA's Table A for work near a line, or Table T for travel with no load, then compare your planned closest approach. The values were read from the eCFR on 25 Oct 2026. A study aid; the employer's plan and the utility decide real work.

Try one free question

Try one question

Question 1 of the free 10-question check on NCCCO written. No signup.

Question 1 of 10 · free checkUntimed

Operations

Which action creates side loading on a crane boom?

Choose an answer to begin

Free NCCCO written study plan

A week-by-week plan from today to your exam, weighted to the published exam outline. We show it here and email you a copy.

Ask Hook before you buy AI your Boom Angle study buddy

See what's on the NCCCO written exam, take the free 10-question check, or find the plan that fits you.

Published references

Values read from the eCFR on 25 Oct 2026. OSHA publishes the rule; the eCFR is the federal government's editorial copy.

Preparing for the NCCCO written exams?

You just saw how voltage sets a distance. Site and Operations questions on the Core exam test the same reasoning about power lines. The free 10-question check scores you by topic in minutes, no signup. The Boom Angle course drills your weak spots and explains every answer.

Take the free 10-question check

By the Boom Angle editorial team. Report an error.

Add this calculator to your site

Copy this HTML with its attribution link. The frame scrolls to include the calculator and explanations; no external script is needed.