Crane net capacity calculator and deduction worksheet

Start with the gross capacity you read from your own crane's chart. Subtract the applicable hook, rigging and attachment deductions, then compare the payload with the remaining net capacity.

Method checked against OSHA 29 CFR 1926.1417 on 17 Oct 2026. A calculation aid for study and estimating, not a substitute for the listed equipment's documentation or the AHJ.

Gross-to-net worksheet

Use pounds (lb) throughout. Enter plain numbers without commas. Results update as you type; entries stay in this page until reload.

These buttons replace capacity, payload and deduction entries.

Read the gross rating from your own crane's chart. This tool supplies no real crane ratings and does not select or interpolate a chart cell.

Every applicable deduction (lb)

Zero means no deduction entered. Verify every row against the chart notes. Use the chart's required deduction or allowance, which may differ from actual component weight. Do not count an item both in the payload and as a deduction, or enter both a group total and its components. Stowed and erected jib allowances are alternatives for the same jib; include only what your configuration and notes require.

Include load-line weight only as the chart requires. Confirm all hook blocks, balls, attachments, extensions and other suspended items that apply. Maximum 50 rows; 1,000,000,000 lb per input is a software bound, not an equipment rating.

Worksheet results · your entries

The 90% band is an editorial worksheet reminder, not an OSHA threshold, critical-lift classification or permission to lift below it. Percent of net payload capacity differs from total suspended weight divided by gross chart capacity. The lift plan may use another measure or a lower limit.

Follow your crane's own chart notes and the lift plan. This calculation aid checks arithmetic only. Confirm configuration, loaded radius throughout the lift, ground support, line pull, reeving, rigging limits, wind and the lift path separately.

CSV includes all current entries, results, mode, references and warnings. Display rounds to three decimals; comparisons and CSV use unrounded values.

Gross vs net capacity: the formulas

Here, G is the gross rating from the correct chart cell for your crane's configuration. D is the sum of all deductions required by that chart's notes. N is the net capacity available for the payload alone. Payload excludes the gear entered as deductions.

  • Total deductions: D = d₁ + d₂ + … + dₙ.
  • Net payload capacity: N = G − D.
  • Remaining arithmetic capacity: N − payload. A negative value means the payload exceeds net.
  • Percent of net capacity: payload ÷ N × 100, only when N > 0.

These are arithmetic definitions, also demonstrated in Boom Angle's original synthetic practice-chart specification and exercises. They do not derive a crane's rating. Your crane's own chart and notes determine the correct rating, what it includes and the required deductions. If the starting value already excludes an item, subtracting it again would double count.

Which deductions belong in the worksheet?

Review the hook block, headache ball, slings, shackles, spreader or lifting beam, jib position, jib extensions, load-line weight and any other item required by the chart notes. Enter chart-specified allowances where required; a jib deduction need not equal its physical weight. An erected jib may require a different chart or restriction, so subtracting its weight alone does not establish capacity. Add rows for other applicable items, and avoid counting a rigging total together with its individual parts.

Confirm the crane, chart revision, loaded radius, boom length, counterweight, support setup and permitted lift area before entering G. Follow the chart's rule for dimensions between listed entries; this worksheet provides no real-chart lookup or interpolation rule.

Worked crane load chart example: invented Practice A

The invented Practice A chart at exactly 30 ft loaded radius and 80 ft main boom gives 24,000 lb gross. Its fictional setup is 360° on fully extended outriggers, standard counterweight, level on firm support and stationary main-boom lifting with an unloaded stowed jib. Subtract a 600 lb hook block, 800 lb stowed jib allowance and 200 lb slings. No other suspended gear is present in this example.

D = 600 + 800 + 200 = 1,600 lb. N = 24,000 − 1,600 = 22,400 lb. A 16,800 lb payload leaves 22,400 − 16,800 = 5,600 lb and uses 16,800 ÷ 22,400 × 100 = 75% of net capacity. Total suspended weight divided by gross would instead be (16,800 + 1,600) ÷ 24,000 × 100 ≈ 76.667%; the measures differ.

Choose “Load invented worked example” above to inspect the labelled chart and change the deductions or payload. All chart values and allowances in that mode come from our existing Synthetic practice-chart specification v1, invented for teaching on 17 October 2026. No manufacturer's chart, NCCCO material or real or recalled exam question is reproduced.

Structural vs stability ratings and the bold line

A structural rating concerns the strength limits of the crane's components. A stability rating concerns resistance to overturning in the specified configuration. Both constrain lifting capacity. OSHA's 1926.1433(b)(1)–(2) distinguishes these rating bases; this worksheet cannot calculate either rating from crane geometry.

Where a chart uses a bold line to distinguish rating bases, read that chart's legend to identify each side. In our invented charts, S above the stepped line is structural and T below is stability. The line is a change in the governing limit, never a safe/unsafe divider or permission to exceed a rating. Your crane's own chart is the authority for its markings and limits.

Operating and configuration checks

OSHA 29 CFR 1926.1417(a), (c)(1), (o) addresses applicable manufacturer procedures, operator access to charts and procedures, load-weight verification and rated-capacity compliance. A correct subtraction cannot establish that the selected cell or load weight is correct.

OSHA 29 CFR 1926.1404(m), (q) addresses component configuration and outrigger/stabilizer setup, including manufacturer-permitted deployment specified in the chart. The assembly/disassembly rigging provisions in (r) have their own scope. This worksheet does not verify assembly, rigging capacity or setup compliance.

Check against your applicable code edition, procedure and the responsible inspector/engineer. Confirm the chart notes, lift plan and all equipment and site limits with the responsible qualified personnel. No percentage here accounts for changing radius, ground bearing, dynamic effects, wind, reeving or line-pull limits.

Published sources and chart authority

Public OSHA sources checked 17 October 2026; section references and original explanations only. OSHA supplies no practice chart values or worksheet warning percentage.

Equipment authority: your crane manufacturer's own current chart, notes and procedures for the exact equipment and configuration. Consult your copy; we neither supply nor reproduce it.

Prepare for the NCCCO written exam

Use the free diagnostic to identify topics to study next, then practise chart reading on our invented charts.

Take the free NCCCO written diagnostic

Try the 10-problem load chart practice tool

By the Boom Angle editorial team. Report an error.